Mossop Construction engaged Campbell Plumbing & Maintenance for the Health Partners development at Morphett Vale. The project created a two-storey building with an undercroft car park, dental facilities, an optical store and consulting rooms.
CPM’s documented work covered stormwater drainage, sewer connections, cold-water distribution, treated-water systems and plumbing fixtures. The installation included two 315-litre electric hot-water units, a circulating system, backflow-prevention devices and thermostatic mixing valves.
