Campbell Plumbing & Maintenance completed hydraulic and wet-fire services for the Riverland Oral Health Centre, which opened in December 2016. The original account describes a ten-chair dental facility with clinical, teaching and support spaces.
The documented work included drainage and effluent systems, fire hydrants and hose reels, hot and cold water distribution, rainwater storage and pumping, and stormwater disposal.
The project also included reverse-osmosis treatment, chlorine dosing, water softening, plumbing fixtures and backflow prevention.
